1.0 OBJECTIVE :
- To define procedure for operation of Reverse Laminar Air Flow (RLAF) unit while Sampling the Raw Material.
2.0 SCOPE :
- This procedure is applicable to M/s. Cleanair System and Devices make Reverse Laminar Air Flow (RLAF), Instrument.
3.0 RESPONSIBILITY :
- Quality control Chemist and above
4.0 ACCOUNTABILITY:
- Quality Control Head
5.0 PROCEDURE :
5.1 PRECAUTION:
- Always keep the pre-filter clean.
- Clean the area and wall under RLAF with swab of 70% Iso Propyl Alcohol solution.
- If pressure is less than 07 mm WG re-clean pre-filter and if more than 14 mm of WG replace HEPA filter.
- Always keep the balances and opened container under safe working zone of RLAF.
- Validate the RLAF once in year by the approved third party.
5.2 OPERATION
- Switch “ON” the main power supply.
- Switch on the ‘Air flow’ and ‘Light’ switch of RLAF 15 minutes before actual weighing to avoid the contamination.
- Note the RLAF- Pressure Monitoring Record from manometer in format (Limit: 07 to 14 mm of WG).
- Record the reading in RLAF pressure monitoring record.
- Now the area is ready for sampling.
- Switch ON the Balance and carry out necessary work.
- Confirm that manometer reading is within Limit.
- In case of power failure wait for 5 minutes before restarting actual weighing operation.
- After completion of work, switch OFF the ‘Air flow’ switch, ‘Light’ switch, and main switch.
6.0 ABBREVIATIONS:
Abbreviation | Expanded form |
RLAF | Reverse Laminar Air Flow |
WG | Water gauge |
mm | Millimeter |
HEPA | High efficiency particulate air |
7.0 ANNEXURES:
- Nil
8.0 SOP REFERENCES
- Manual of Reverse Laminar Air Flow
END OF THE SOP